Projects

FEATURED PROJECTS

Landfill Gas to Energy (LFGTE) Project

Project Overview

  • Landfill Gas to Energy (LFGTE)
  • Electrical Installation and commissioning of 4 x APG1000 Generator Modules (1MWe) powered by waste gas at the North Waikato Regional Landfill site, Hampton Downs.
  • The first stage of this project involved the supply, packaging, installation and commissioning of a pair of Generator Modules. Each module comprises a Waukesha APG1000 Enginator, rated for 1,000kWe continuous duty on landfill gas. The modules are self-contained power stations, requiring fuel gas and electrical connections. Included within the modules are dump heat radiators, PLC control/switchgear panels, ventilation fans, exhaust systems, plus oil and water tanks.
  • The second stage of the project involved the supply, packaging, installation and commissioning of the second pair of Generator Modules which now can produce a combined peak output of 4 MWe.
  • Project Value: Approximately $200,000

>> read more

 
 

 

Independent Liquor Honeywell Burner Air Ratio Control Upgrade Project

Project Overview

  • Independent Liquor Honeywell Burner Air Fuel Ratio Controller Upgrade, Papakura, Auckland.
  • Scope was the Removal of old unreliable Jack Shaft Air Fuel controller and replaced with new Honeywell ControLinks electronic Air Fuel Ratio Controller.
  • Athenry Electrical Ltd designed a working electrical document to allow the Honeywell ControlLinx integration to existing Siemens LGK16 Burner management system.
  • Project Value: Approximately $20,000

>> read more

 

Pit Dewatering Pump Upgrade Winstone Aggregates Hunua Quarry

Project Overview

 
Tandem Connected Pit dewatering Pump System
  • Project Value: Approximately $65,000.00 plus New 22kv supply and transformer from Counties Power
  • Electrical design and install includes all wiring and control of 2 x 37kw centrifugal pumps connected in series (Tandem) for the purpose of pumping water seepage and ingresss within Winstone Aggregates Hunua Quarry pit, ensuring source rock availability when required (No Flooding)
  • The project commenced with the design stage in October 2007 which incorporated discussions and communications with Counties Power for the purpose of HV supply, load requirements to determine transformer Kva rating and its location. Also Pump configuration layout and the variable consequences for electrical supply, installation and pump control design
  • With the design factors agreed and signed off, the installation was commenced in October 2007 and completed in May 2008

>> read more

 

 

OTHER PROJECTS:

 

  • Genesis Energy Huntly Power Station

    Installation of Dräger fixed wire gas detection system for monitoring; Methane, Propane, Hydrogen and Carbon Monoxide gases Preferred Supplier status to Huntly Power Station for Hazardous Area Electrical

  • Mighty River Power Mokai Geo Thermal Power Station

    Installation of Dräger fixed wire gas detection system for monitoring Pentane gas

  • New Zealand Dairy Processing Factory (Tauranga)

    Electrical installation for new milk process factory incorporating all process wiring, Building services, HVAC

  • Visy Beverage Wiri

    Backend Upgrade Project: Electrical install of new backend machines and upgrade of complete line control automation system Winning NHP Industrial Automation Award at the 2013 ECANZ Excellence Awards

  • Pernod Ricard, Glen Innes

    Engineering for Automated Line Control Systems and Electrical Installation Process control engineering for wine preparation

  • Lion Breweries, East Tamaki

    Electrical installation for CO2 Recovery Plant, Water Treatment Plant and various ongoing plant process upgrades and modifications as required

  • Winstone Aggregates Quarries

    Electrical services for preventative maintenance, repairs and breakdown support on a continuous basis. (Including Thermal Imaging reports and electrical inspections)

    Electrical engineering and installations as required to various quarry sites Athenry has preferred supplier status

  • Fonterra Brands Tip Top, Mt Wellington

    Supply and installation of the Dräger fixed wiring Ammonia gas detection system plus the automation and plant emergency response strategy Electrical installation providing Emergency lighting installation and upgrade throughout plant Athenry has preferred supplier status

  • Fonterra Brands Dairy Factory, Takanini

    Supply and installation of the Dräger fixed wiring Ammonia gas detection system Installation for Ash Air Smart Air Management System for site process compressed air Ongoing maintenance shift cover as required

  • ENTEC Services Ltd - Landfill Gas to Energy (LFGTE)

    Electrical installation and commissioning of Generator Modules (up to 1MWe) powered by waste gas Also providing ongoing electrical engineering support, electrical repairs maintenance and breakdowns as required (Including Thermal Imaging reports and electrical inspections, both hazardous and general)

  • Alinta Energy, Glenbrook Steel Mill Co-Generation Facility

    The ongoing supply of electrical services providing; Preventative maintenance (Including Thermal Imaging reports and electrical inspections), breakdown and project work

 

  Bookmark this page in your web browserwww.athenryelectrical.co.nz - About UsCartNo Items in your Cart